Question # 1

What type of passive heat exchanger can wrap around an evaporator coil to precool entering air and reheat the air after the cooling coil without adding more moisture to the supply air stream?

A.

Desiccant heat wheel

B.

Plate and frame

C.

Heat pump

D.

Heat pipe

E.

Run-around coil

Question # 2

Which of the following statements best describe Demand Control Ventilation (DVC) in Building Automation Systems?

A.

It satisfies indoor ventilation rates by preconditioning outdoor air with the exhaust air to decrease energy cost during cold, warm, or humid weather

B.

It's a prescriptive procedure in which outdoor air intake rates are calculated based on the energy cost method that compares a proposed building design to a base annual energy cost design

C.

It's a building standard for enclosed spaces in which biological, chemical, and physical contaminants are considered to meet thermal comfort requirements

D.

It's an active evaluation of outdoor and indoor space conditions to determine the amount of thermal, mechanical and natural conditioning that is required

Question # 3

How can you tell if steam traps in a steam distribution system may NOT be working correctly?

A.

Robust flash steam rising from condensate receiver tank vent pipes

B.

An increase in make-up water requirements relative to steam demand

C.

Rapid chattering of disk steam traps

D.

No sound from inverted bucket steam traps

E.

All of the above

Question # 4

How much energy (kJ) is required to heat 2 kg of water from 25°C to 2 kg of water at 100°C? (The specific heat of water (C) is 4.2 kJ/kg-°C. Assume no system losses.)

A.

420 kJ

B.

510 kJ

C.

630 kJ

D.

840 kJ

Question # 5

A heat pump water heater has an annual average coefficient of performance (COP) of 2.1 and heats water from 15°C to 50°C. Hot water use is 100 liters per day, 365 days/yr. The electricity cost is $0.10/kWh. What is the annual water heating cost? (The specific heat of water (C) is 4.2 kJ/kg-°C.)

A.

$44.88/year

B.

$52.20/year

C.

$64.66/year

D.

$70.97/year

E.

$88.29/year

Question # 6

What is the purpose of monitoring energy consumption?

SELECT THE CORRECT ANSWER

A.

To establish a basis of management control

B.

To establish when and why there is a deviation in energy consumption patterns

C.

To support analysis of energy information

D.

All of the above

Question # 7

A 50-kW induction motor (1,500 rpm synchronous speed) has a nameplate full-load rotational speed of 1,455 rpm. Field measurements show the actual rotational speed is 1,475 rpm. Using the slip method, calculate the partial load factor of the motor.

A.

46%

B.

56%

C.

80%

D.

98%

E.

101%

Question # 8

An energy-saving project costs $540,000. The project will have maintenance costs of $25,000 per year. The energy savings from the project are $160,000 per year. The project has a life of 10 years with no salvage value. The minimum attractive rate of return (MARR) is 10%. Using end-of-year cash flows, calculate the net-present value (NPV) of the project.

A.

$154,657

B.

$289,575

C.

$311,556

D.

$456,254

Question # 9

A gas-fired boiler is operating with 31.9% excess air. A feedwater economizer is used to reduce the stack temperature rise from 310°C to 160°C. Using the natural gas combustion efficiency tables in your workbook, find the energy savings from the economizer as a percentage of historical fuel consumption.

A.

1.2%

B.

3.1%

C.

5.8%

D.

7.1%

E.

9.3%

Question # 10

You are using a performance contract to finance the added cost of using more-efficient equipment in the construction of a new building. Which of the following International Performance Measurement and Verification Protocol (IPMVP) options would you use to verify annual energy savings?

A.

Option A - Retrofit isolation: key parameter measurement

B.

Option B - Retrofit isolation: all parameter measurement

C.

Option C - Whole facility measurement

D.

Option D - Calibrated simulation

E.

Option E - Stipulated savings