Pre-Summer Special Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

Page: 1 / 4
Total 33 questions
Exam Code: CCPSC                Update: Apr 19, 2026
Exam Name: CCPS Process Safety Professional Certification

AIChE CCPS Process Safety Professional Certification CCPSC Exam Dumps: Updated Questions & Answers (April 2026)

Question # 1

Which of the following is not essential to Conduct of Operations:

A.

A strong process safety culture

B.

Widely understood but unwritten ways the work is accomplished

C.

Defining roles and responsibilities

D.

Establishing standards for performance

Question # 2

Discuss the advantages and disadvantages of using competent third-party auditors for facility process safety audits.

A.

Third-party auditors only provide benefits with no disadvantages

B.

Third-party auditors provide independence but may lack site-specific knowledge and can be costly

C.

Third-party auditors are always less effective than internal auditors

D.

Third-party auditors eliminate the need for internal audits

Question # 3

A common design safety factor typically used for pressure vessels is:

A.

10 times the MAWP

B.

1.5 times the MAWP

C.

4 times the MAWP

D.

1 times the MAWP (Maximum Allowable Working Pressure)

Question # 4

A strong Management of Change system should ensure that: (select all that apply)

A.

Emergency changes do not require Management of Change controls

B.

Root causes are identified

C.

Adequate evaluations of the potential safety and health impacts are performed

D.

Appropriate updates have been made to the preventive maintenance requirements

E.

Temporary changes are returned to normal by the required date

Question # 5

A field operator contacted the control room about a leaking connection on a heat exchanger. The control room operator instructed the field operator to bypass the heat exchanger. However, unknown to the control room operator, additional piping had recently been installed upstream of the heat exchanger, and had not been recorded on the P & ID. When the field operator incorrectly opened a valve in the new piping, the process stream was routed to an unintended location.

Which of the following groups of Risk Based Process Safety elements, if properly implemented, could have prevented this incident?

A.

Process Knowledge Management – Safe Work Practices – Management of Change

B.

Management of Change – Conduct of Operations – Emergency Management

C.

Process Knowledge Management – Management of Change – Training and Performance Assurance

D.

Asset Integrity – Training and Performance Assurance – Management of Change

Question # 6

Contractors were installing a heating coil in a small tank. When the job was nearly complete, the workers went on break, but one of them stayed behind and entered the tank alone. It is believed that while doing so, he inadvertently bumped open the nitrogen supply line lever-operated valve. He was later found dead inside the tank. Based only on the information provided in this brief description, which of the RBPS (Risk Based Process Safety) elements most directly apply to this event? (Select all that apply)

A.

Safe Work Practices

B.

Contractor Management

C.

Measurement and Metrics

D.

Management Review and Continuous Improvement

E.

Auditing

F.

Emergency Management

Question # 7

Which one of the following Hazard Identification and Risk Analysis (HIRA) methods is generally considered to be most quantitative in nature?

A.

Failure Modes and Effects Analysis

B.

What-If Analysis

C.

What-If/Checklist Analysis

D.

Bow-Tie Analysis

E.

Hazard and Operability (HAZOP)

Question # 8

A 3000 gallon, stainless steel, insulated vessel rated for 30 psig is equipped with a rupture disc set for 30 psig for emergency relief. Assuming each of the following scenarios has been deemed possible, which would require the smallest sized relief?

A.

A pool fire from the leak of a common solvent beneath the vessel

B.

An internal ignition of the vessel’s vapor space, the vessel containing a solvent

C.

A runaway reaction of the vessel’s contents, in solvent service, where testing has determined a temperature rise rate of 500°C/min at disc relief setting

Question # 9

A line is provided for adding a chemical to a reactor to quench the reaction. The line has an automatic valve which is designed to open when reactor temperature exceeds the High-High limit. Which of the items are key parts of the ITPM (Inspection, Testing, and Preventive Maintenance) requirements for the valve? (Select all that apply)

A.

Valve must be functionally tested to ensure that it opens quickly enough to quench the reaction

B.

Valve must be designed to open quickly enough to quench the reaction

C.

Valve and its control system must be inspected and tested with sufficient frequency to confirm that it will reliably open when required

D.

Valve must be designed to fail open

Question # 10

An organization with strong Conduct of Operations is able to minimize: (select all that apply)

A.

Misunderstanding of expectations

B.

The frequency of operator refresher training

C.

The normalization of deviation

D.

The frequency of process safety incidents

E.

The frequency of process safety audits

Page: 1 / 4
Total 33 questions

Most Popular Certification Exams

Payment

       

Contact us

Site Secure

mcafee secure

TESTED 20 Apr 2026