Question # 1

Which method will allow IT and Facilities to monitor every aspect of the data center?

A.

Enterprise management system (EMS) only

B.

Network-critical physical infrastructure (NCPI) only

C.

EMS and building management systems (BMS) through an NCPI element manager

D.

Enterprise management system (EMS) and building management systems (BMS) with integrated backbone

Question # 2

Which can cause a swell or surge to occur in the data center's electrical system?

A.

UPS failure

B.

CRAC unit startup

C.

Transformer failure

D.

Sudden load reduction

Question # 3

Which is an example of a rack-oriented cooling architecture?

A.

A cooling unit is located in the ceiling plenum to cool the data center racks.

B.

A cooling unit is located within the rack itself to cool the contents of that rack.

C.

A cooling unit utilizes perforated raised floor tiles to deliver cool air to the rack.

D.

A cooling unit is located along the perimeter wall of the data center to cool a specific zone of racks.

Question # 4

What are the three elements of the fire triangle? (Choose three.)

A.

Fuel

B.

Heat

C.

Smoke

D.

Oxygen

E.

Nitrogen

Question # 5

Which is an example of a row-oriented cooling architecture?

A.

Each cooling unit works to cool the load through a raised floor plenum.

B.

Each cooling unit is ceiling mounted and targets cool air to the cold aisles.

C.

Each cooling unit works directly to cool the heat load of a specific equipment rack.

D.

Each cooling unit is placed along the data center wall and cools the general air space.

Question # 6

What is a disadvantage of air cooled self-contained systems?

A.

Higher capital costs for smaller installations

B.

Requires refrigerant piping to be installed in the field

C.

Often requires installation of duct work or dropped ceiling

D.

Introduces an additional source of liquid to the data center

Question # 7

A network-critical physical infrastructure (NCPI) Management strategy should incorporate what information at the rack level to ensure reliable IT equipment operation? (Choose two.)

A.

Rack "U" space

B.

Network switches

C.

Individual branch circuits

D.

Rack access to equipment

Question # 8

Which substance transfers heat most efficiently?

A.

Gas

B.

Solid

C.

Liquid

D.

Vapor

Question # 9

Which two statements describe the parallel redundant UPS configuration? (Choose two.)

A.

It uses older and outdated technology.

B.

The parallel redundant UPS configuration is not scalable.

C.

If one UPS module goes down, the other UPS module(s) assumes the load.

D.

Both modules must be the same design, manufacturer, rating, technology, and configuration.

Question # 10

Your data center has a 75 kW load and is located in a building that would require long distances between the indoor and outdoor cooling units. There is no cooling tower available and reducing capital cost is a priority.

Which heat rejection method should be used?

A.

Chilled water system

B.

Water cooled system

C.

Glycol cooled system

D.

Air cooled split system