Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dcdisc65

Page: 1 / 5
Total 49 questions
Exam Code: CCQM                Update: Oct 15, 2025
Exam Name: Certified Construction Quality Manager

ASQ Certified Construction Quality Manager CCQM Exam Dumps: Updated Questions & Answers (October 2025)

Question # 1

What is the best method for evaluating the success of integrating mutually accepted design modifications into a construction agreement?

A.

Evaluate whether the contractual revisions reflect the agreed-upon changes accurately

B.

Measure how quickly the changes are implemented into the ongoing project

C.

Assess the number of additional changes requested after the initial agreement

D.

Check if the changes result in immediate cost savings

Question # 2

Which of the following methods would be best for evaluating the effectiveness of existing inspection protocols for critical materials in a construction project?

A.

Analyzing the historical data of material failures and how it correlates with inspection records

B.

Comparing the frequency of inspections with industry standards

C.

Surveying project team satisfaction with the inspection process

D.

Reviewing the cost savings achieved by reducing the frequency of inspections

Question # 3

When evaluating the warranty program documentation during project turnover, it is crucial to verify that

A.

the warranty documentation is included in the project's final financial report

B.

the warranty information was reviewed during the last project audit

C.

the documentation provides clear instructions on filing claims and whom to contact for warranty issues

D.

all project managers have signed off on the warranty documents

Question # 4

What is the primary purpose of a change order directive in construction project management?

A.

Suggest optional changes that may be considered by the project team.

B.

Serve as a preliminary notice that does not require immediate action or acknowledgment.

C.

Informally discuss potential changes without creating any binding agreements.

D.

Formally authorize and document modifications to the original scope.

Question # 5

The effectiveness of steps taken to achieve organizational goals based on implemented CoQ improvements should be evaluated by

A.

focusing exclusively on short-term improvements to judge effectiveness

B.

considering the initial cost reductions that are achieved

C.

analyzing both short-term results and long-term trends in quality and financial performance

D.

evaluating how many CoQ improvement projects are initiated

Question # 6

A construction company is experiencing a significant increase in material waste on multiple sites. Which of the following quality tools should be used to identify and prioritize the biggest sources of waste?

A.

Use a scatter diagram to analyze the relationship between material suppliers and waste levels.

B.

Utilize flowcharts to map out the entire material procurement process.

C.

Apply a Pareto chart to identify and prioritize the biggest sources of waste.

D.

Implement control charts to monitor waste levels over time.

Question # 7

In relation to quality assurance, why is it important to document quality metrics?

A.

To track project quality performance over time

B.

To provide a basis for legal disputes

C.

To serve as promotional material for future projects

D.

To facilitate quicker decision-making on financial matters

Question # 8

When is retaining certain risks internally a viable and effective strategy?

A.

When the cost of mitigating the risk exceeds the potential impact

B.

When the organization wants to avoid using external consultants

C.

When risks are fully understood and can be managed without significant disruption

D.

When all project stakeholders agree to share the burden of the risk equally

Question # 9

What is the most important factor to consider when revising acceptance criteria based on insights from periodic quality reports?

A.

Ensuring the revisions meet the preferences of the project management team

B.

Ensuring the revised criteria align with identified quality trends and project objectives

C.

The frequency with which the criteria have been revised during the project

D.

The level of stakeholder agreement with the proposed revisions

Question # 10

When conducting an authority having jurisdiction (AHJ) review, what should be the primary focus to effectively analyze the project's adherence to established criteria?

A.

The number of past successful projects completed without AHJ interventions

B.

General industry standards associated with the project

C.

The specific requirements set by the AHJ

D.

The experience of the construction team with AHJ personnel

Page: 1 / 5
Total 49 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 16 Oct 2025