Question # 1

Which of the following benefits is associated with using the iterative model?

A.

It can be tailored to the needs of the project and organization.

B.

It does not require knowledge of all the requirements up front.

C.

It correlates directly to the deliverables of software development.

D.

It focuses on exploring options early by feedback through prototyping

Question # 2

A software configuration baseline is best described as

A.

the installation of the configuration library

B.

one or more configuration items tested

C.

one or more configuration items approved

D.

one or more configuration items packaged for shipment

Question # 3

Software configuration status accounting is the process of

A.

partitioning the software product into formally identified configuration items

B.

systematically controlling changes to software items under configuration control

C.

recording and reporting of information needed to effectively manage a software configuration

D.

providing objective assurance that the software configuration items being built match their requirements

Question # 4

Which of the following describes when a test plan should be changed?

A.

After product stability has been assessed

B.

After changes to the design specifications

C.

After each code review

D.

When the configuration management tool is updated

Question # 5

Which of the following statements describes the output from a code coverage monitor?

A.

Calculated values are documented, including where the calculations were made.

B.

Data types are manipulated by the correct modules.

C.

Lines of code are executed in the correct order.

D.

Lines of code and branches or paths have been executed.

Question # 6

Which of the following activities is part of performing verification and validation on safety-critical features at even ' step of the life cycle?

A.

Identifying and mitigating security risks to prevent safety and hazard risks

B.

Documenting software safer. ' risk plans that include rigorous development processes

C.

Performing software hazard analysis and determining acceptable levels of safety risks

D.

Providing mechanisms for discovering, correcting, and preventing the recurrence of safety’ risks

Question # 7

Which of the following statements best describes the purpose of a matrix diagram?

A.

It allows a team to rank priorities and then quickly come to a consensus.

B.

It shows which problems offer the greatest potential for improvement.

C.

It allows a systematic comparison between sets of information.

D.

It shows the size of gaps between current and ideal performance areas.

Question # 8

Which of the following techniques will improve the accuracy of data collection the most?

A.

Automating the data evaluation process

B.

Training staff m the data gathering process

C.

Defining the data gathering time frame

D.

Analyzing post-project data

Question # 9

Rank in order, from first to last, the following steps in creating an affinity diagram.

    Conduct an interview, focus group, or brainstorming session

    Draw a diagram

    Group similar statements

    Identify themes

A.

1, 3, 4, 2

B.

1, 4, 2, 3

C.

2, 1, 4, 3

D.

2, 4, 1, 3

Question # 10

An organization uses the plan-do-check-act (PDCA) cycle to align its processes to an international quality standard, which of the following activities would be performed during the " act " step?

A.

Identifying actions to be performed during the pilot

B.

Performing internal audits of the system

C.

Making quality system revisions

D.

Documenting the problems to present to management