A customer is using AEM on AMS as the central content provider for its omnichannel presence with more than 100+ authors working around the clock and 30+ concurrent authors. The customer is happy with the performance of the author server, but they have a critical requirement to guarantee no data loss and quick failover in the event of any author failure. Which deployment strategy would the AEM architect use for the author environment?
A company is implementing a new e-commerce site that is expected to get seasonal and flash-sale induced traffic peaks from all over the world. It is projected that a minute of downtime could cause excessive lost revenue. The company management wants to keep resource utilization to optimal levels without experiencing degradation to avoid introducing bugs in the system.
The Architect needs to choose between AEM 6.5 and AEM as Cloud Service.
What are the two most critical non-functional requirements the Architect must consider? (Choose two.)
In a client's test environment AEM QA Testers from multiple groups and regions are testing and making requests to the AEM application. Due to the sheer number of hosts making connections, an Architect needs a quick and easy way to allow any hosts to make requests to the AEM application.
Which approach should the Architect take to meet this requirement for this non-production environment?
A customer's DAM and Sites is growing exponentially while preparing for a go-live. The AEM architect has noticed that the online compaction on the author failed yesterday and finds this log entry:
INFO [pool-23-thread-1] com.adobe.granite.maintenance.impl.MaintenanceJobsManagerImpl
Name='RevisionCleanupTask', Status='ERROR',
Result='Revision GC: Stopped by user.',
Details='("created":1668218400006,"started":1668218400006,"finished":1668229200598,"duration":10800592}'
What step would the architect take to resolve this issue for the production environment with no downtime?
A client has a site that serves both authenticated and anonymous users. A subsection of the site, which is applicable for only logged-in users, is resource intensive. In order to have a scalable yet secured solution, using available features what would an architect choose for concerned hierarchy?
On AEM 6.5, when an editor tries to edit pages on the author, some pages only show a blank screen. Upon inspection of the logs, the following exception is found:
Which action would an architect try to restore functionality to the system without data loss?
A website hosted in AEM 6.5 is re-structured with new information architecture for site hierarchy including a new content root. The go-live release is planned to be divided into a few phases on a country basis. Those countries not involved will continue to be served with the existing content resources.
Which configuration would be implemented for the website to continue serving without impacting existing website journeys?
A client wants to change how they publish their content. Refer to the following client business requirements:
• The client has a seasonal business that has significant content changes across their site that need to be rolled out at once based on the season change over date.
• The content authors need to be able to work one season in advance of publish dates to ensure that all changes can be completed on time.
• The content authors need a way to indicate that all the seasonal changes are ready. If the content changes are not completed, then the pages should not get published.
• The content authors need the ability to modify the current live pages without rolling back changes for a future content rollout.
What approach should the Architect recommend?
A client's site does not show the latest page content for some site visitors. The client has two data centers with each configured with a Dispatcher connected to two Publish machines. The site load issue only occurs intermittently for visitors from one of the data centers.
Which step should the Architect take to resolve the issue?
A client is upgrading their live site hosted on AEM via AMS from version 6.3 to 6.5. The client prefers Blue Green deployment approach and hence not choosing an in-place upgrade.
Which tool would the architect use to migrate the existing content to new servers?