Weekend Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

Page: 1 / 10
Total 96 questions
Exam Code: RCDDv14.1                Update: Sep 13, 2025
Exam Name: BICSI Registered Communications Distribution Designer – RCDDv14.1

BICSI BICSI Registered Communications Distribution Designer – RCDDv14.1 RCDDv14.1 Exam Dumps: Updated Questions & Answers (September 2025)

Question # 1

The type of apparatus housed in ERs vary greatly in size, purpose and function. Which two of the following active equipment is included? (Choose two.)

A.

Cross-connect facilities

B.

Telecommunications equipment

C.

Environmental controls

D.

Lighting controls

E.

Building system equipment

Question # 2

The program manager completed the program's benefits analysis and planning activities. What will this ensure tor the program?

A.

Information necessary to establish key benefit performance indicators

B.

A transition plan to facilitate the ongoing realization of benefits

C.

A plan to monitor performance due to operational, financial, and benefits changes

D.

A benefits management plan to guide the work through the remainder of the program

Question # 3

The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?

A.

=929 m2 (10,001 ft2)

B.

=1858m2 (20,001 ft2)

C.

=3716 m2 (40,001 ft2)

D.

=4645 m2 (50,001 ft2)

Question # 4

Which two of the following types of metallic conduit REQUIRE threaded couplings? (Select two options.)

A.

Electrical metallic tubing (EMT)

B.

Aluminum metal conduit (AMC)

C.

Flexible metal conduit (FMC)

D.

Intermediate metal conduit (IMC)

E.

Rigid metal conduit (RMC)

Question # 5

A program to implement a new payroll processing system at a healthcare company is nearing completion and is under budget. What should the program manager do next?

A.

Request permission from the program governance board to initiate program closure activities

B.

Present additional opportunities to the program sponsor

C.

Apply the remaining budget to operational activities

D.

Apply the remaining budget to deferred enhancement requests

Question # 6

What is the MAXIMUM recommended length for A in the image below?

A.

70 m (230 ft)

B.

90 m (295 ft)

C.

100 m (320 ft)

D.

150 m (495 ft)

E.

300 m (985 ft)

Question # 7

The program manager wants to ensure that a program contributes to shareholder value. The program manager should verify alignment with which of the following?

A.

Program charter

B.

Organizational structures and policies

C.

Organizational strategic objectives

D.

Program governance plan

Question # 8

A program manager recognizes that a successful resource being used in project A could also be used in project B. What should the program manager do first to leverage the utilization of this resource?

A.

Assign project A's resource to project B

B.

Reassign the resource to project B after protect A ends

C.

Prioritize the resource to optimize their use across both projects A and B

D.

Mitigate risk by leveraging other resources in project A

Question # 9

Which stakeholder of a project team is responsible to provide closeout documentation to the client? Architect

A.

Authority

B.

Having Jurisdiction (AHJ)

C.

Construction Manager

D.

ICT Distribution Designer/Project Manager

Question # 10

The marketing department of a firm has tasked the organization to design a structured cabling system allowing them to support either 10G6aseT or HDBASE-T. The budget requires that only one cable type be installed and that it be MINIMUM compliant. Of the following choices, what is the choice with the MINIMUM solution/solutions for the client?

A.

Category 5e

B.

Category 6

C.

Category 6A

D.

Category 7

Page: 1 / 10
Total 96 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 13 Sep 2025