Question # 1

Which scheduling method BEST shows the interrelationships of tasks?

A.

work plan

B.

Gantt chart

C.

critical path

D.

milestone chart

Question # 2

What deliverables are the responsibility of the interior designer in the design development phase?

A.

Power and data plans, floor plans with partition types

B.

Floor plans, reflected ceiling plans with HVAC ductwork layout

C.

Reflected ceiling plans with fixture types, floor plans with partition types

D.

Power and data plans, reflected ceiling plans with sprinkler head locations

Question # 3

The ground floor of a building contains a mixed occupancy with a retail store (9,500 sf [884 m²]) with an adjacent storage space (2,000 sf [186 m²]), a daycare (5,000 sf [465 m²]), and an office (6,000 sf [557 m²]). Based on the chart below, what is the occupant load for this floor?

Occupancy Type

Occupant Load Factor (sf/person)

Retail (Mercantile)

60

Storage

300

Daycare

35

Office (Business)

150

A.

305

B.

368

C.

524

D.

527

Question # 4

The designer attends the weekly progress meetings and is responsible for the meeting minutes. How does the designer ensure that the minutes prepared are accurate?

A.

Issue a clause in the minutes indicating that minutes are approved and accepted as written

B.

Issue minutes including a clause stipulating minutes will be approved within 24 hours of issue

C.

Issue minutes including a clause enabling attendees to submit revisions within a specified time frame

D.

Issue draft minutes within 24 hours of the meeting, followed by final minutes within 72 hours of meeting completion

Question # 5

The office manager for a client signed a contract for design services. However, the owner refuses to pay the design fee because the office manager did not have the authority to sign the contract. This is an issue of

A.

mutual assent

B.

breach of contract

C.

contractual capacity

D.

designer responsible disclaimer

Question # 6

What floor finish would BEST support a passive solar design strategy in a hot arid climate?

A.

vinyl

B.

wood

C.

carpet

D.

concrete

Question # 7

Which of the following should be installed at regular intervals to avoid cracking of a GWB ceiling from building structural movement?

A.

J mold

B.

U channel

C.

Control joint

D.

Elastic sealant

Question # 8

In a soft goods furniture specification, what information should always be included?

A.

Fabric specification

B.

Installation instructions

C.

Location of the item on the plan

D.

Furniture vendor’s contact information

Question # 9

A project is running behind schedule and over budget. What should the designer do FIRST?

A.

Review and determine budget cuts with the client

B.

Simplify installation methods to save both cost and time

C.

Contact the client to discuss the problem as soon as possible

D.

Rank construction priorities and complete the critical path elements first

Question # 10

What should be evaluated by the design team in advance of a project kickoff with clients and stakeholders?

A.

Cost analysis and value engineering

B.

Site availability and schedule impacts

C.

System performance and subcontractor availability

Page: 1 / 6
Total 52 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 13 Sep 2025