Question # 1

A Cisco Unified Computing System environment must be configured for a server that requites access to VLAN 30 for data and VLAN 40 for management The server must have failover capabilities The upstream connectivity will be provided by using a Cisco Nexus 9000 Series Switch. Which action must be taken to meet these requirements?

A.

Use a single virtual network interface card for both VLANs and assign the vNlC lo a dynamic LAN pin group.

B.

Create a virtual network interface card for each VLAN and configure the host to use load balancing.

C.

Create a virtual network interface cards for each VLAN and enable vNIC fabric failover

D.

Use a single virtual network interface card for both VLANs and apply a network control policy for prioritization.

Question # 2

Refer to the exhibit An engineer must capture fiber channel traffic from the

server and the supervisory to the Cisco MDS 9000 Series Switch Fabric.

The traffic must be forwarded to the analyzer. Drag and drop the

code snippets from the right onto the blanks in the code on the

left to complete the configuration. Not all code snippets are used

Question # 3

Refer to the exhibit. Which command must be used to configure a VXLAN NVE tunnel interface such that MAC and IP address information are learned in the control plane?

A.

ingress-replication protocol bgp

B.

host-reachability protocol bgp

C.

host-reachability protocol static

D.

ingress-replication protocol static

Question # 4

An engineer upgrades the bash on the Cisco Nexus 9000 Series Switch.

Which command must be used to complete the task?

A.

rpm -qa

B.

rpm -Uhv

C.

upgrade -U

D.

update -vh

Question # 5

Which two features are used to allow a nondisruptive upgrade for the ISSU process? (Choose two.)

A.

connectivity management processor

B.

nonstop forwarding

C.

graceful restart

D.

stateful switchover

E.

advanced services license

Question # 6

An engineer needs to implement a solution that will provide telemetry of MDS 9000 switches in a SAN fabric. The solution should use Cisco Data Center Network Manager (DCNIM) with SAN insights feature. Which three steps are required to deploy the solution? (Choose Three.)

A.

Select a target Fabric to be monitored.

B.

Activate ENTERPRISE_PKG license on target switches

C.

Select the target ports to be monitored for telemetry data

D.

Configure name resolution between the devices

E.

Select a target VSAN to be monitored

F.

Activate SAN_ANALYTICS_PKG license on target switches

Question # 7

What is the impact of upgrading an EPLD of a fabric switching module on the Cisco MDS 9700 Series Switch?

A.

The standby supervisor becomes an active supervisor with no impact.

B.

The traffic flow in the module is interrupted due to the restart power cycle.

C.

The control plane is reloaded and no data plane disruption occurs on the active supervisor.

D.

The FAN module power cycle is not restarted.

Question # 8

A network architect considers a Cisco HyperFlex design

solution for a company. The proposed solution is for a virtual environment that is not performance-sensitive, but the solution must have high storage capacity and a low cost. Which Cisco HyperFlex storage configuration should be used?

A.

All-Flash

B.

Hybrid

C.

All-SAN

D.

All-NVMe

Question # 9

Which Cisco Nexus console line interface is shown in this output?

switch# dir bootflash:

25863680 Sep 23 12:02:16 2020 m9250-sSek9-kickstart-mz.8.2.1.bin

25864704 Sep 05 12:21:26 2021 m9250-s5ek9-kickstart-mz.8.2.1.bin

29869312 Apr 01 12:29:34 2021 m9250-sSek9-kickstart-mz.8.2.2.bin

25869312 Apr 12 01:55:22 2021 m9250-s5ek9-kickstart-mz.8.2.2.bin

25947136 Nov 09 13:41:43 2021 m9250-s5ek9-kickstart-mz.8.3.1.bin

29970176 Jan 17 14:10:47 2021 m9250-sSek9-kickstart-mz.8.3.2.bin

26126848 May 07 11:51:20 2021 m9250-s5ek9-kickstart-mz.8.4.1.bin

[output omitted]

Usage for bootflash://sup-local

1050153904658 bytes used

638636406560 bytes free

A.

Guest shell

B.

Bash shell

C.

NX-OS CLI

D.

NX-OS kickstart CLI

Question # 10

Which Cisco UCS component does an infra bundle “A” software upgrade?

A.

BIOS

B.

I/O module

C.

adapter

D.

board controller