Question # 1

Which documents are commonly included as procurement documents?

A.

Project record documents

B.

Contract documents

C.

Consensus documents

D.

Bidding documents

Question # 2

Which meeting is held for the purposes of introducing the design and construction teams, establishing the ground rules for communication, and explaining the administrative process?

A.

Mobilization meeting

B.

Preconstruction meeting

C.

Prebid meeting

D.

Coordination meeting

Question # 3

Where should the contractor continuously document changes made in the field due to actual conditions encountered, such as foundation pier depth and the location of concealed internal utilities?

A.

Conformed set

B.

Record set

C.

Change order log

D.

Request for information documents

Question # 4

Which of the following establishes a baseline from which deviations are identified?

A.

General requirements

B.

Supplementary conditions

C.

Project manual

D.

General conditions

Question # 5

What does the Integrated Project Delivery (IPD) process involve?

A.

A collaborative, integrated, and productive team composed of key project participants

B.

Traditional delivery methods and team relationships for improving project performance by understanding the qualifications and attributes of team members

C.

Responsibility silos for greater efficiencies, leading to project success

D.

Segregat knowledge gathered as needed with paper-based communications to team members

Question # 6

Which of the following is LEAST important to log when documenting the decision-making process?

A.

Date, time, and location of the meeting

B.

List of attendees and who they represent

C.

Length of time each attendee spent speaking

D.

Action items with responsibilities assigned and date to accomplish

Question # 7

When is decommissioning required for a facility?

A.

When the entire building is going to be demolished

B.

When the facility is no longer needed for operations

C.

When the facility will not be used again in the future

D.

When the building changes owners

Question # 8

An architect/engineer (A/E) is reviewing a claim from a contractor asking for more money and time on the project. The A/E plans to reject this claim based on documentation supplied by the contractor indicating what reason?

A.

There was active interference by the owner.

B.

There were conditions beyond the control of the contractor or owner.

C.

The A/E modified the contract documents.

D.

There is defective work needing repair.

Question # 9

With whom does the responsibility for maintaining record documents at the project site rest?

A.

Contractor

B.

Architect/engineer (A/E)'s consultant

C.

A/E's project representative

D.

Owner's project representative

Question # 10

Which of the following is a format that standardizes the way text is arranged in specification pages so that it is best suited for easy reading and rapid reference?

A.

SectionFormat®

B.

PageFormat

C.

MasterFormat®

D.

UniFormat®