Question # 1

Client has provided the specification as per the image for low flow shower heads. What is the flow rate for shower heads that should have been entered to EDGE software?

A.

4

B.

6

C.

1,315

D.

3,590

Question # 2

How many measures need to be selected in order to meet the EDGE Energy Standard?

A.

5 measures

B.

20 measures

C.

20% of the measures listed

D.

At least all required measures

Question # 3

Which of the following elements is considered in EDGE to estimate water use in homes?

A.

HVAC

B.

Water heating

C.

Exterior fountains

D.

Solar water heaters

Question # 4

In EDGE software, occupancy sensors are used for controlling:

A.

Lighting.

B.

Water taps.

C.

Air conditioners.

D.

External lighting.

Question # 5

Air-cooled chillers have the following components:

A.

Cooling tower, condenser, condenser pump, evaporator.

B.

Compressor, condenser, thermal expansion valve, evaporator.

C.

Chilled water pump, condenser, thermal expansion valve, evaporator.

D.

Compressor, water-cooled condenser, thermal expansion valve, evaporator.

Question # 6

Energy consumption calculations in EDGE are based on:

A.

Hourly simulation.

B.

Steady state calculations.

C.

Quasi-steady state calculations.

D.

Cooling and heating degree days.

Question # 7

Increasing the glazing area of an office building will NOT impact which of the following?

A.

Cooling demand

B.

Heating demand

C.

Lighting energy

D.

Hot water demand

Question # 8

Variable speed drives in HVAC systems help:

A.

Reduce the speed.

B.

Increase the speed.

C.

Reduce energy consumption.

D.

Reduce water consumption.

Question # 9

What does the EDGE Auditor provide in the EDGE certification process for a project they are auditing?

A.

Building design services

B.

Approval of the building design

C.

Recommendation for certification

D.

Recommendation of materials and building systems

Question # 10

Water consumption savings, resulting from greywater recovery, are based on which of the following?

A.

Base case water consumption

B.

Improved case water consumption

C.

Cost of water consumption at local tariff

D.

Incremental cost of installation and cost of water consumption at local tariff