Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dcdisc65

Page: 1 / 3
Total 22 questions
Exam Code: D-VXB-DY-A-24                Update: Oct 6, 2025
Exam Name: Dell VxBlock Deploy Achievement

EMC Dell VxBlock Deploy Achievement D-VXB-DY-A-24 Exam Dumps: Updated Questions & Answers (October 2025)

Question # 1

Based on the RCM Upgrade Process RACI, who is responsible and accountable for the pre-upgrade questionnaire used during the Initiation Phase?

A.

Customer and Customer Advocate

B.

Customer and Assessment Lead

C.

Project Manager and Assessment Lead

D.

Project Manager and Customer

Question # 2

What is used to collect VxBlock component information during an RCM Assessment?

A.

VMware vRealize Operations

B.

VMware Configuration Automation Tool

C.

Dell EMC SCR

D.

Element Manager

Question # 3

A customer is using Cisco UCS 6332-16UP 40-Port Fl. They have 16 ports dedicated for FC traffic. The customer needs to increase the number of FC ports.

What is a consideration?

A.

Unused server ports can be converted to FC ports

B.

Maximum number of supported FC ports is 32

C.

Unused FCoE ports can be converted to FC ports

D.

Maximum number of supported FC ports is 16

Question # 4

A System Engineer is working on an implementation of the VxBlock 1000. What is a required task in the final implementation step during the Deployment Phase?

A.

Verify system physical configuration against LCS

B.

Execute the agreed-upon test plan

C.

Configure Cisco Smart Call Home

D.

Connect to individual Element Managers

Question # 5

Which NSX security policy component applies rules to child policies automatically from the parent policies?

A.

Inheritance

B.

Rules

C.

Control

D.

Weight

Question # 6

A VxBlock 1000 is running VMware vSphere 6.7. To support an audit, a customer engineer is trying to map the networking components in the VxBlock to a traditional datacenter

architecture.

Which component should the engineer map to the access switch?

A.

VMware virtual distributed switch

B.

Fabric Interconnect

C.

Nexus 1000V switch

D.

Nexus 9306PX switch

Question # 7

A VxBlock 1000 UCS domain is being managed via Fabric Interconnect (FI) A as the cluster lead. The expansion team adds two new B-series servers to the domain. When

attempting to vMotion from the existing blades to one of the new blades, the power to Fabric Interconnect A is disconnected.

What is the expected result?

A.

vMotion completes successfully, but access to the vCenter will be lost

B.

vMotion fails, but is automatically retried once the Fl comes back online

C.

vMotion fails because the Fl managing the session is powered off

D.

vMotion completes successfully despite the FI power failure

Question # 8

Which file system architecture is used on Isilon storage to deliver increased performance for file-based data applications and workflows?

A.

Distributed

B.

Single

C.

Multiple

D.

Hybrid

Question # 9

A System Engineer is validating system cabling for a VxBlock 1000. They find that some ports on Fabric Interconnects 1A are not connected.

Which connections are missing?

A.

Network uplinks to Nexus switches

B.

Network uplinks to the customer network

C.

SAN uplinks to MDS switches

D.

Server uplinks to C-Series servers

Question # 10

What is the responsibility of the Implementation Specialist during the deployment cycle?

A.

Physically uncrate VxBlock racks and acclimatize

B.

Perform inter-rack cabling

C.

Execute test plan and validation

D.

Create the Site and Logical Configuration Surveys

Page: 1 / 3
Total 22 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 06 Oct 2025