Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dcdisc65

Page: 1 / 3
Total 30 questions
Exam Code: D-VXR-DY-23                Update: Jan 19, 2026
Exam Name: Dell VxRail Deploy 2023

EMC Dell VxRail Deploy 2023 D-VXR-DY-23 Exam Dumps: Updated Questions & Answers (January 2026)

Question # 1

An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible

What action must be performed before adding the node?

A.

Order node with correct image

B.

RASR Factory Reset

C.

RASR Factory Image Upgrade

D.

Compute node expansion

Question # 2

An implementation engineer is expanding an existing VxRail S Series cluster with an additional node. The version of the node is not at the current cluster level but is compatible.

What procedure would result in the quickest node addition?

A.

RASR Factory Image Upgrade

B.

Factory Reset

C.

VxRail Node Imaging Management

D.

Compute node expansion

Question # 3

A systems engineer is performing a VxRail upgrade in a VMware Horizon VDI cluster All hosts are put in Maintenance Mode.

What action does the engineer need to perform on each host once the upgrade has been completed?

A.

From the Connection Server run IcMaintcmd to delete the parent VMs and exit Maintenance Mode for each host

B.

From the Connection Server, run IcMaintcmd to take the hosts out of Maintenance Mode and reboot them

C.

Set the InstantClone Maintenance annotation value to the original value

D.

Set the InstantClone Maintenance annotation value to 2

Question # 4

A VxRail Test Plan has been completed What is the protocol for recording the results'?

A.

With the implementation team, complete and document each test, test date, and a screenshot of results

B.

In front of a customer, complete each test and document the test date

C.

With the implementation team, complete each test and document the test date

D.

In front of a customer, complete and document each test, test date, and a screenshot of results

Question # 5

An implementation engineer is tasked with setting up RecoverPoint for VMs on a new 4-node E Series VxRail duster How many VMs are licensed to be protected on the cluster?

A.

5

B.

10

C.

20

D.

25

Question # 6

What is the minimum number of VxRail nodes required for a vSAN storage policy with RAID-6 (Erasure Coding)?

A.

4

B.

5

C.

6

D.

7

Question # 7

A VxRail D560 cluster was delivered six months ago and now needs to be prepared for installation with the target code. What is the correct method to complete the task?

A.

Boot into RASR ISO and perform a RASR Reset

B.

Boot into RASR USB and perform a RASR Reset

C.

Boot into SD card and perform a Factory Reset

D.

Boot into RASR ISO and perform a Factory Reset

Question # 8

A company has recently implemented a popular date center monitoring and reporting software solution. They plan to use the solution to consolidate reporting into a single platform.

What is an expected benefit of programmatically gathering VxRail information?

A.

Perform node shutdowns and specific operations

B.

Perform pre-checks for vSAN health

C.

Automate iDRAC firmware management and status

D.

Obtain status of all running operations on a cluster

Question # 9

An infrastructure system audit will begin in two weeks All data center devices will be checked to ensure they contain the installed patches and configurations. A system engineer will update the VxRail hosts with the latest patches and remediate security vulnerabilities.

What troubleshooting resource can a user receive from Dell and use proactively to help perform the remediation tasks?

A.

KB articles

B.

SolVe Online

C.

Log files

D.

Advisories

Question # 10

What is a consideration when expanding a VxRail cluster? (Choose two.)

A.

Mixing of All-Flash and all-NVMe nodes in a cluster is not allowed

B.

Expanding a cluster to 64 nodes requires a 25 GbE network

C.

G Series clusters can be expanded only with G Series nodes

D.

1 GbE must be hybrid and single processor node type

Page: 1 / 3
Total 30 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 19 Jan 2026