Question # 1

What is the advantage or disadvantage of using MPO (Multi-fiber Push On)/pre-terminated fiber?

A.

There is no advantage, as it cannot be used with OM4 optical fiber cables.

B.

There is no advantage, as it creates additional heat load in the data center.

C.

It speeds up installation and provides an easy upgrade to transmission speeds up to 40 Gbit/s -100 Gbit/s.

D.

It is a very flexible system as it can be used for both copper cables and optical fiber cables.

Question # 2

A battery bank has 800 Ah total capacity. How much charging current should the rectifier be able to supply?

A.

40 A

B.

60 A

C.

80 A

D.

160 A

Question # 3

When designing a data center network, your company wants to minimize the number of network switches to manage.

What type of physical cabling layout would be the best choice?

A.

ToR (Top of Rack) design

B.

EoR (End of Row) design

C.

Star network design using coaxial cables

D.

It does not matter as the number of switches is not influenced by the physical cabling layout

Question # 4

What is the first step in the design stage of the data center life cycle?

A.

Select vendors

B.

Do a design validation

C.

Define the scope of the project

D.

Freeze the design

Question # 5

A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not available.

What type of generators should be installed?

A.

Standby generators should be installed in at least an N+1 configuration

B.

Continuous generators should be installed, at least in an N+1 configuration

C.

A combination of standby-, prime-, and continuous-generators, as the duration of the power outage is unpredictable. The total available capacity of the generators should be at least 500% of the data center load

D.

Continuous generators should be installed; no N+1 configuration is needed as the generators will run all the time

Question # 6

It is assumed that EMF shielding material must be installed as the EMF levels coming from the transformer room into the computer room are measured at 100mG. The transformer room is approximately 10 meters away from the computer room and is separated by a corridor. You can assume that no physical issues are present for installing shielding material at any area/location.

Where should you recommend the shielding material to be installed?

A.

As close as possible to the computer room

B.

As close as possible to the transformer room

C.

It does not matter, either close to the transformer room or the computer room is okay as there is no impact to cost or shielding material performance

D.

Shielding is not required to be installed as 100mG is within the acceptable levels for computer rooms

Question # 7

Racks with 1.0 m depth and cold aisle containment with 3 perforated tiles are used. What aisle pitch is recommended?

A.

5 tiles pitch rule

B.

7 tiles pitch rule

C.

8 tiles pitch rule

D.

10 tiles pitch rule

Question # 8

Which of the following statements is correct?

A.

With current increasing, single-phase cables emit more EMF than three-phase cables

B.

With current decreasing, three-phase cables emit more EMF than single-phase cables

C.

With voltage increasing, single-phase cables emit more EMF than three-phase cables

D.

With voltage decreasing, three-phase cables emit more EMF than single-phase cables

Question # 9

In which stage of the data center life cycle does commissioning take place?

A.

Retire

B.

Operate/optimize

C.

Implement

D.

Design

Question # 10

Do all residual current devices (RCDs) use the same operating principle?

A.

Yes, they all detect current differences on live and neutral wire

B.

Yes, they all measure voltage on the earth conductor

C.

No, ELCB measures earth voltage, whereas RCD detects current differences

D.

No, depending on regulations some use thermal-magnetic operation