What is the advantage or disadvantage of using MPO (Multi-fiber Push On)/pre-terminated fiber?
A battery bank has 800 Ah total capacity. How much charging current should the rectifier be able to supply?
When designing a data center network, your company wants to minimize the number of network switches to manage.
What type of physical cabling layout would be the best choice?
What is the first step in the design stage of the data center life cycle?
A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not available.
What type of generators should be installed?
It is assumed that EMF shielding material must be installed as the EMF levels coming from the transformer room into the computer room are measured at 100mG. The transformer room is approximately 10 meters away from the computer room and is separated by a corridor. You can assume that no physical issues are present for installing shielding material at any area/location.
Where should you recommend the shielding material to be installed?
Racks with 1.0 m depth and cold aisle containment with 3 perforated tiles are used. What aisle pitch is recommended?
Which of the following statements is correct?
In which stage of the data center life cycle does commissioning take place?
Do all residual current devices (RCDs) use the same operating principle?