Question # 1

What are the benefits of PowerEcho for the NetEco?

A.

Web-based unified maintenance interface

B.

Operation wizard

C.

Quick fault locating

D.

One-click health check

Question # 2

Which of the following is a standard component in the FusionModule800 typical configuration?

A.

PAD

B.

Video surveillance system

C.

Intelligent lock

D.

iBattery

Question # 3

Which of the following methods can be used to open the access control for the FusionModule2000 smart module?

A.

Fingerprint

B.

Card reader

C.

Password

D.

Facial recognition

Question # 4

Which of the following statements about ECC800-Pro features are true?

A.

Supports multiple unlocking method including access card, password, fingerprint, and facial recognition.

B.

Supports the connection of eight access control devices and four cameras for a single smart module.

C.

Supports the cascadingof a maximum of 4 ECC800-Pros.

D.

Supports wizard-based deployment and commissioning.

Question # 5

Which of the following statements is true about UPS5000 power modules and bypass modules?

A.

The UPSS000-E-200K and UPS5000-E-400K use the same power module and provide the same capacity of 50 kVA but have different numbers of power modules.

B.

For UPSs of the same model but in different power segments, their bypass module capacity is the same.

C.

The power module capacity of both the UPS5000-S and UPS5000-E is 50 kVA. Therefore, the two types of UPS can be used together.

D.

The power modules used in the UPSS000-S-1200K are the same as those used in the UPS5000-E-200K.

Question # 6

The optional temperature and humidity sensor for the UP55000 cannot be cascaded.

A.

True

B.

False

Question # 7

Commissioning NetCol5000-C drainage devices, after lifting the high float for 5 seconds, two water pumps start working, and the drain abnormal alarm is generated.

A.

True

B.

False

Question # 8

Which of the following requires a cooling tower or drycooler?

A.

Direct ventilation air conditioning system.

B.

DX air cooled air conditioner.

C.

CW air cooled air conditioner.

D.

DX water cooled air conditioner.

Question # 9

Three UPS5000-E-400Ks from a 2+1 parallel system. Which of the following statements about the parallel system are true?

A.

The parallel system capacity displayed on the LCD is 1200 kVA.

B.

The networkingmode is set to one-to-multiple for one UPS, and set to one-to-one for the other two UPSs.

C.

If the load is 420 kW, each of two UPSs carries 210 kW load, and the other one is standby and does not carry load.

D.

If the load is 420 kW, each of the three UPSs carries 140kW load.

Question # 10

The power system of a UPS2000-G-15K at a site is three-phase input and single-phase output. After installation, it is found that the mains and bypass inputs are three-phase, the output is single-phase, and the mains and bypass inputs share a power source. Which of the following statements are true about the UPS wiring mode?

A.

The wiring mode is incorrect, if the upstream mains input switch is turned on, the UPS will be short-circuited and damaged immediately.

B.

The wiring mode is correct. The UPS can start properly.

C.

The wiring mode is incorrect. The UPS cannot work in battery mode, but can still work in bypass mode or inverter mode.

D.

The wiring mode is incorrect. The correct wiring mode should be single-phase bypass input, three-phase mains input, and one power source.

Page: 1 / 2