Question # 1

While trying to upgrade AOS in a cluster, a consultant receives a warning message that there are two powered-on VMs that need to be powered off for the upgrade to proceed.

What would cause this warning to be issued?

A.

Upgrading a single-node cluster requires the VMs to be shut down.

B.

Upgrading a two-node cluster requires the VMs to be shut down.

C.

There are not enough resources left in the single-node cluster.

D.

There are not enough resources left in the two-node cluster.

Question # 2

A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.

What should the consultant do to verify that Foundation has completed successfully?

A.

Return to the Foundation configuration page and start over.

B.

Update Java on the Foundation VM.

C.

Connect to any CVM IP address from a web browser.

D.

Restart the Foundation process.

Question # 3

An administrator needs to relocate an AHV cluster to a new datacenter during a maintenance window. The cluster will use the same IPs in the new datacenter.

Which two steps should be taken to prepare for this task? (Choose two.)

A.

Stop all Nutanix Files clusters

B.

Relocate the linked LDAP servers

C.

Shut down all user VMs in the cluster

D.

Reconfigure IPMI for the new datacenter

Question # 4

A consultant is setting up a new vSphere cluster. Customer requirements are as follows:

* VMs should automatically failover to another host if the host crashes

* Host CPU and Memory resources should be evenly balanced

* New VMs should be placed on the host with the most resources available

Which two settings should be turned on to meet the requirements? (Choose two.)

A.

vShpere DRS

B.

vSphere HA

C.

vSphere vMotion

D.

vSphere Power Management

Question # 5

Refer to the exhibit.

What is the purpose of eth2 on the CVMs?

A.

RDMA Network Segmentation

B.

iSCSI connectivity

C.

Remote site connectivity

D.

Network Segmentation

Question # 6

While reviewing the BOM during the kickoff call, a consultant notices that there are six NX nodes and 12 SFP+ modules, but no fiber cables are listed.

Which statement is correct regarding this scenario?

A.

Only copper cables, not fiber cables, are required for SFP* modules.

B.

The customer can use any fiber cable from existing network devices.

C.

Nutanix provides fiber cables based on the fiber channel ports on the server.

D.

The consultant should remind the customer that it is their responsibility to procure compatible fiber cables.

Question # 7

An administrator protected a DB VM running on a Nutanix cluster with NearSync Replication, which schedules to repeat every 15 minutes □ to a second site. The daily change rate is low. During nightly backups, the replication window is missed due to write volume.

Which two options describe the expected behavior? (Choose two.)

A.

NearSync stops working and fails over to the remote site.

B.

Protection Domain transitions back to the hourly schedule.

C.

The Administrator needs to re-enable it manually.

D.

The system continuously tries to get to the NearSync schedule.

Question # 8

An administrator needs to migrate workloads from a Nutanix cluster running VMware ESXi to Nutanix AHV. The migration process needs to be completed in multiple VM groups and support roll back in case any problems are found during user acceptance testing.

Which action should the administrator perform?

A.

Use Cross Hypervisor DR to replicate VMs from ESXi to AHV

B.

Use VMware Converter

C.

Use Nutanix one-click cluster conversion from ESXi to AHV

D.

Use storage live migration

Question # 9

After the migration, some SQL queries take longer to execute than prior to migration.

The following SQL best practices were applied while creating the SQL VM on Nutanix:

•8 vDisks per SQL server VM

•Database and Log files on separate vDisk

•2 TempDB database drives and 1 TempDB log drive

What should the administrator to do improve the SQL Server performance?

A.

Redistribute existing data by creating additional database file and enable autogrowth

B.

Create multiple TempDB data files and enable autogrowth

C.

Create multiple SQL log files and disable autogrowth

D.

Redistribute existing data by creating additional database files and disable autogrowth

Question # 10

An administrator is responsible for the following Nutanix Enterprise Cloud environment:

• A central datacenter with a 20-node cluster with 1.5PB of storage

• Five remote sites each with a 4-node cluster with 200TB storage

The remote sites are connected to the datacenter via 1GB links with an average latency of 6 ms RTT. What is the minimum RPO the administrator can achieve for this environment?

A.

0 minutes

B.

15 minutes

C.

1 hour

D.

6 hours

Page: 1 / 10
Total 92 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 16 Jul 2025