Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dcdisc65

Page: 1 / 3
Total 24 questions
Exam Code: NCSE-Level-1                Update: Oct 16, 2025
Exam Name: Nutanix Certified Systems Engineer (NCSE): Level 1

Nutanix Nutanix Certified Systems Engineer (NCSE): Level 1 NCSE-Level-1 Exam Dumps: Updated Questions & Answers (October 2025)

Question # 1

An SE determines a POC is necessary for a prospect that has struggled with application downtime due to hypervisor and firmware upgrades that have exceeded planned maintenance windows. The prospect has also struggled with infrastructure resource planning for their growing development environment.

Which two success criteria should the SE include? (Choose two)

A.

The solution provides integrated reporting on resource utilization trends.

B.

The solution provides automated upgrades without downtime or performance impact.

C.

The solution can accelerate VM provisioning through REST APIs.

D.

The solution supports provisioning new storage in less than 15 minutes.

Question # 2

A prospect's existing SAN-based environment regularly experiences unpredictable storage performance and latency spikes during peak utilization. The most highly affected workload is general server virtualization.

Which Nutanix feature addresses this pain point?

A.

AHV-Turbo Mode

B.

Data Locality

C.

Shadow Clones

D.

Persistent Op-log

Question # 3

An SE is building a solution for Federal government prospect that requires FIPS 140-2 Level 2 encryption for data at rest.

Which two items are required to deliver a solution that meets the encryption standard? (Choose two)

A.

Nutanix Acropolis Pro License.

B.

Self-Encrypting Drives.

C.

A supported Key Management Server.

D.

Nutanix Prism Pro Licensing.

E.

Nutanix Software encryption.

Question # 4

An SE is conducting a first call presentation with their Account Executive and a prospect. The prospect needs to build a private cloud but has been unable to implement the solution in-house, since using their traditional architecture would require integrating server, storage and networking solutions from six different vendors.

The cost and complexity of that approach is too high. Also their current infrastructure is not built for scalability or performance.

The prospect has considered upgrading their traditional server and SAN storage platforms but could not meet requirements for scale and performance using this approach.

In what order should the SE present the critical product and technology portions of the First Customer Presentation to the IT Director?

A.

Native convergence of traditional infrastructure.

Scalable distributed system.

Data locality and distributed data.

Application automation with Calm.

Xi Cloud Services.

B.

Application automation with Calm.

Xi Cloud Services.

Native convergence of traditional infrastructure.

Scalable distributed system.

Data locality and distributed data.

C.

Xi Cloud Services.

Application automation with Calm.

Native convergence of traditional infrastructure.

Scalable distributed system.

Data locality and distributed data.

D.

Data locality and distributed data.

Scalable distributed system.

Native convergence of traditional infrastructure.

Xi Cloud Services.

Application automation with Calm.

Question # 5

An SE is working with a financial institution prospect on a VDI environment refresh. The institution currently has 5000 named VDI users, with a peak of 2800 concurrent users.

How many VDI VMs does the SE need to size for, factoring in an additional 10% for growth?

A.

2880

B.

3080

C.

5000

D.

5500

Question # 6

Which option should be recommended for a customer to get timely notification of significant product issues in the field.

A.

Visit the Nutanix.com website.

B.

Open Prism Element > Gear Icon Menu > Field Advisories.

C.

Visit the portal.nutanix.com website > Documentation tab > Security Advisories.

D.

Register for Field Advisories email notifications.

Question # 7

In a competitive POC scenario, the prospect is testing Nutanix against VxRail and Hyperflex. The customer is interested in an ""All in One"" solution that's simple to deploy, manage, and grow.

Which two test plan items should the SE map to POC success criteria?

(Choose two)

A.

Deploy HCIbench to determine maximum IOPS.

B.

Deploy Calm to automate application deployment.

C.

Expand the cluster by adding an additional node.

D.

Use a single interface to manage and monitor the full stack.

E.

Enable all data efficiency settings.

Question # 8

An SE builds a Sizer scenario for SQL server running on Cisco C240 M4 servers.

Using only the Sizer BOM, which two actions can be performed? (Choose two)

A.

Reference the HCL for additional SKU’s relevant to the configuration.

B.

Review budgetary pricing.

C.

Review workload sizing details.

D.

Build a complete BOM in Cisco commerce Workspace (CCW)

Question # 9

A prospect discloses they have had multiple instances of unplanned downtime in the last 3 months due to server hardware failures. The team has been through multiple reorganizations in support of a struggling cloud migration project. As a result, cummunication whithin the team has suffered and some notifications from their SNMP based monitoring solution have been ignored.

Which Nutanix feature should the SE highlight?

A.

Pulse

B.

Insights

C.

Prism

D.

Watchtower

Question # 10

Which two Citrix desktop creation capabilities are supported on Nutanix AHV? (Choose two)

A.

Provisioning Service

B.

System Center Virtual Machine Manager

C.

Composer

D.

Machine Creation Services

E.

Desktop Delivery Controller

Page: 1 / 3
Total 24 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 16 Oct 2025