Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dcdisc65

Page: 1 / 4
Total 33 questions
Exam Code: 1z0-1094-23                Update: Oct 15, 2025
Exam Name: Oracle Cloud Database 2023 Migration and Integration Professional

Oracle Oracle Cloud Database 2023 Migration and Integration Professional 1z0-1094-23 Exam Dumps: Updated Questions & Answers (October 2025)

Question # 1

What TWO ways does Data Pump use to move data to the cloud? (Choose all correct answers)

A.

RMAN Backup and Restore

B.

pdb unplug/plug

C.

import over Oracle Database database link

D.

import dump file from OCI Object Storage

Question # 2

How can you properly pause a Zero Downtime Migration (ZDM) job?

A.

By executing the zdmcli -pausejob command at any time

B.

By executing the zdmcli migrate database command with the -pauseafter option, alongside specifying the relevant migration phase where ZDM should pause the migration process,

or by executing the zdmcli suspend job -jobid command at anytime during the migration

C.

By executing the zdmcli migrate database command using the -pause option

D.

By querying the ZDM service host with the relevant job ID and executing the zdmcli -pausejob command

Question # 3

You have executed the mappings with Change Data Capture ( CDC ) on the source data store and you are now going through the code in the operator log for debugging. Which two tables or view do you need to inspect in the database to see whether the CDC process is writing changed data or not in Oracle Data Integration ( ODI )? (Choose all correct answers)

A.

JV$D view

B.

J$ table

C.

JV$ view

D.

JW$ view

Question # 4

Which of these can be used to unload and load data via Data Pump? (Choose two.)

A.

Dumpfile

B.

Streamfile

C.

Network mode (with database links)

D.

Backupset

Question # 5

You want to replicate data real time between two Oracle Databases. Which integration product should you use?

A.

Oracle Enterprise Data Quality

B.

Oracle GoldenGate

C.

Oracle Data Integrator

D.

Oracle Enterprise Manager

Question # 6

You have a requirement to join data from an Oracle database table and a flat file and load into target DB2 table, using Oracle Data Integrator (ODI). Which statement is correct about this?

A.

Heterogeneous sources and targets are possible in a single mapping only if there is no incremental data load.

B.

Flat file data has to have a header row in order to join with Oracle database table in a single mapping

C.

It is not possible to join data from different source connection types in a Single mapping

D.

It is possible to mix heterogeneous source connection type and load into any supported target connection type in a single mapping.

E.

It is possible to join data from different source connection types in mapping, but the result must be loaded to Oracle.

Question # 7

Which migration method gives you the least down time?

A.

Data Guard

B.

RMAN point-in-time recovery

C.

Transportable Tablespaces

D.

Data pump

Question # 8

Which two prerequisites are required to install Oracle Zero Downtime Migration (ZDM) software? (Choose two.)

A.

Oracle Grid Infrastructure installed on the ZDM service host

B.

100 GB of free storage space

C.

8 GB of RAM

D.

Installation of the "glibc-devel" and "expect" packages

E.

50 GB of free storage space

Question # 9

Your data warehouse load consists of extracting data from order header and order line items table. what kind of journalizing type should you use in Oracle Data Integration ( ODI ) to make sure referential integrity is maintained in the target?

A.

Consistent

B.

Application Base

C.

Complex

D.

Simple

Question # 10

Which are TWO benefits of Extract-Load-Transform (ELT) over traditional Extract-Transform-Load (ETL) architectures? (Choose all correct answers)

A.

ELT architecture reduces the amount of network traffic over traditional ETL tools, which use a dedicated server.

B.

ELT architecture can easily become a bottleneck by placing excessive loads on the target servers.

C.

ELT architecture does not require dedicated hardware and leverages native data management engines, such as Big Data and RDBMs.

D.

Traditional ETL tools use a dedicated server, which provides better performance as it can be sized to any workload.

Page: 1 / 4
Total 33 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 16 Oct 2025