Question # 1

How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

A.

Select a special procurement type inside the material master.

B.

Use a special item category in your material BOM (bill of material).

C.

Select a special MRP type inside the material master.

D.

Define the special procurement type inside the material BOM (bill of material).

Question # 2

You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

A.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator.

B.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.

C.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.

D.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator.

Question # 3

Which business processes are affected by settings in the order type-dependent parameters? Note: There are 2 correct answers to this question.

A.

Schedule production orders.

B.

Check material availability.

C.

Select master data.

D.

Define integration with cost accounting.

Question # 4

In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

A.

MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.

B.

MRP creates the capacity requirements without considering existing load on the work centers.

C.

MRP creates the capacity requirements at the earliest possible time.

D.

MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.

Question # 5

What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question.

A.

Queue time

B.

Teardown time

C.

Move time

D.

Setup time

Question # 6

Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

A.

Base unit of measure

B.

Industry sector

C.

Selection screen for views

D.

Product type

Question # 7

What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

A.

Planned order

B.

Scheduling agreement schedule line

C.

Production order

D.

Purchase order

Question # 8

How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.

A.

Digital signature

B.

Approved resources

C.

Recipe approval

D.

GMP-compliant flag

E.

Batch record

Question # 9

What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?

A.

The MRP run assumes external procurement.

B.

The MRP run assumes in-house production.

C.

The MRP run plans the material only if a quotation has been maintained.

D.

The MRP run does NOT consider the material; it has to be planned interactively.

Question # 10

You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?

A.

Assembly processing with production orders (82)

B.

Planning with final assembly (40)

C.

Production by lot size (30)

D.

Planning at assembly level (70)