Weekend Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

Page: 1 / 3
Total 24 questions
Exam Code: E_S4HCON2023                Update: Sep 13, 2025
Exam Name: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade

SAP SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade E_S4HCON2023 Exam Dumps: Updated Questions & Answers (September 2025)

Question # 1

Which are valid options to check the progress of the database migration in a Microsoft Windows environment?

There is correct answers to this question.

Response:

A.

Check the "Charts Control Center" in the SUM UI

B.

Check logs for jobs starting with "RSUPG_SGEN" in the system

C.

Check the log files written under "SUM\abap\log"

D.

Check the dump size of the database export on disk

Question # 2

You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.

What does the "Calculated level" indicate for those software components?

Please choose the correct answer.

Response:

A.

The SAP Support Packages that will be bound to the upgrade

B.

The SAP Support Packages contained in the upgrade media

C.

The SAP Support Packages found in the download directory

D.

The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner

Question # 3

During a DMO procedure with SUM, after which phase is the repository first available on the target database?

Please choose the correct answer.

Response:

A.

Uptime migration (EU_CLONE_MIG_UT_RUN)

B.

ParaUel distribution (PARDIST_SHD)

C.

Downtime migration (EU_CLONE_MIG_DT_RUN)

D.

Shadow repository creation (EU_IMPORT*)

Question # 4

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.

Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.

Why are 40 Process Buckets executed in parallel?

A.

These are 40 pairs of Reload processes, so there are 80 R3load processes running.

B.

SUM is still running in uptime; the 40 defined Reload processes are considered.

C.

Without table contents comparison, only 40 R3load processes are being started.

D.

There are 40 Reload processes used for copying and 40 Reload processes for table count verification.

Question # 5

What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

A.

To optimize the migration

B.

To optimize the activation

C.

To optimize the conversion

D.

To optimize the main import

Question # 6

Which preparational steps must be performed for an SAP S/4HANA conversion?

There are 2 correct answers to this question.

Response:

A.

Uninstall industry extensions not supported by SAP S/4HANA

B.

Install add-on SAP Gateway 7.50

C.

Uninstall Fiori apps not released for SAP_UI 7.50

D.

Delete client 066 (Early Watch Client)

Question # 7

What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

A.

750

B.

700

C.

731

D.

740

Question # 8

You want to execute a Unicode Conversion only. Which approach do you need to follow?

Please choose the correct answer.

Response:

A.

SWPM using the Backup / Restore procedure

B.

SUM with DMO

C.

SUM without DMO

D.

SWPM using the Load procedure

Question # 9

How does SUM recognize modification adjustment transports from predecessor systems?

Please choose the correct answer.

Response:

A.

By searching for transport requests that are assigned to the project SAP_ADJUST

B.

By searching for transport requests named K0

C.

By searching for transport requests in DIR_TRANS, subdirectory "transport"

D.

By searching for transport requests in the file umodauto.Ist

Question # 10

You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

A.

The SAP support packages that will be bound to the conversion

B.

The SAP support packages contained in the upgrade media, calculated by the maintenance planner

C.

The SAP support packages of the support package stack, calculated by the maintenance planner

D.

The SAP support packages in the download directory that are newer than the selected support package stack

Page: 1 / 3
Total 24 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 13 Sep 2025