Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dcdisc65

Page: 1 / 3
Total 29 questions
Exam Code: S10-210                Update: Oct 15, 2025
Exam Name: Storage Networking Management and Administration

SNIA Storage Networking Management and Administration S10-210 Exam Dumps: Updated Questions & Answers (October 2025)

Question # 1

You have been hired to consult with storage administrators that are working with zoning and naming convention consistency issues. There are numerous types of zoning methods available using standards that also include aliasing. You want to use a method that guarantees unique global port identification.

What accomplishes this goal?

A.

WWPN

B.

domain_id:port_#

C.

Alias

D.

Zone set

Question # 2

A security audit reveals deficiencies in your company's FC zoning practices. Your manager asks you to make a recommendation to implement the most secure FC zoning possible. Your company is using switches from a single vendor.

What do you recommend?

A.

All zones should use frame-based hardware enforcement using pWWN identification exclusively for all configurations.

B.

All zones should use software-based enforcement using pWWN identification exclusively for all configurations.

C.

All zones should use frame-based hardware enforcement using destination port identification exclusively for all configurations.

D.

All zones should use software-based enforcement using destination port identification exclusively for all configurations.

Question # 3

Which two high availability elements can be achieved by remote storage replication? (Choose two.)

A.

Recoverability

B.

Fault tolerance

C.

Robustness

D.

Redundancy

E.

Serviceability

Question # 4

Click the Exhibit button.

Referring to the exhibit, which backup type is represented?

A.

Server-free backup

B.

Cloud backup

C.

LAN-free backup

D.

LAN backup

Question # 5

A customer has upgraded all switches in their redundant fabrics during a single maintenance window. Shortly after the upgrades are completed on the core switches, all servers lose access to all SAN attached storage.

What would have prevented this scenario?

A.

High availability

B.

Fault tolerance

C.

Change or risk management

D.

Clustered servers

Question # 6

You are provisioning storage to a host with multipathing software installed and correctly configured. You discover that there are four paths to LUNs instead of the expected eight paths.

Why does this happen?

A.

Incorrect zoning

B.

Incorrect multipathing policy

C.

Incorrect LUN masking

D.

Incorrect LUN size

Question # 7

You are asked to secure 2.5 PB of data so that in case of a failed drive replacement, data on the drives is not usable.

Which data protection method should be used in this case?

A.

Encrypting data-in-flight

B.

Encrypting data-at-rest

C.

Password protect each file

D.

Use file permissions

Question # 8

Click the Exhibit button.

Referring to the configuration shown in the exhibit, when will the servers oversubscribe the connections between the storage array and the switch?

A.

When the 6th server is added to the configuration

B.

When the 7th server is added to the configuration

C.

When the 8th server is added to the configuration

D.

When the 9th server is added to the configuration

Question # 9

A line of business (LOB) executive informs you that a new application requires 99.999% (five 9s) of up-time from both planned and unplanned outages before a service level objective (SLO) will be breached.

What is the amount of permissible downtown per week?

A.

20.16 minutes

B.

.605 seconds

C.

5.04 minutes

D.

6.06 seconds

Question # 10

A business critical enterprise resource planning (ERP) system uses a central database at a company's primary data center. The company has built an out-of-region disaster recovery data center and intends to implement a standby ERP system with an eight hour RTO and 30 minute RPO.

Which architectural approach to implement service continuity for the ERP database will meet the RTO and RPO targets?

A.

Implement asynchronous replication of the ERP database, application, and middle tiers to ensure the ERP system is back online with less than 30 minutes of data loss within eight hours of an event.

B.

Implement asynchronous replication of the ERP database, application, and middle tiers to ensure the ERP system is back online with less than eight hours of data loss within 30 minutes of an event.

C.

Perform daily full database backups to tape and overnight ship the backup tape media from one data center to the other to ensure the ERP system is back online with less than eight hours of data loss within 30 minutes of an event.

D.

Implement synchronous database replication and configure application logic to ensure transactions are identical in both data centers as the recovery objectives do not allow for any inflight data loss.

Page: 1 / 3
Total 29 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 16 Oct 2025