For a LEED forNeighborhood Development project thathas yet to earn all land use entitlements, which of thefollowing should the project team pursue to assist with local approvals?
A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?
Atleast how many buildings within a LEED for Neighborhood Development project must be certified by a green building rating system?
A mixed-use project without transit service has the following characteristics:
* 55 townhomes on 9 acres (3.6 hectares) of buildable land
* 44.000 ft2 (4.088 m2) of commercial building on 87.120 ft2(9.094.m2) Of buildable land
What should be added to the development plan to meet the minimum density requirements for Neighborhood Pattern and Design Prerequisite Compact Development?
A mixed-use development includes a 150.00011'' (13.935 m2) office building. Which energy analysis option can be considered under Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance for this building?
A LEED tot Neighborhood Development project team may need to contact or use reference materials from the U.S. Environmental Protection Agency of local equivalency outside the US. Regarding.
A community seeking LEED tor Neighborhood Development Certificationisplanning to design and constructa permanent gardenand provide related facilities for local residents to cultivate food production. The community Is in an area of 10 acres (4.05 hectares) and contains 120 dwelling units. According to the requirements of'local food production.* what is the minimum area of the community garden?
A)
B)
C)
D)
A city is building a mixed neighborhood which is attempting LEED for Neighborhood Development certification
There are two supermarkets, one former’s market, one bank three restaurants, one laundry and one hair salon within a 1/2 mi. (0.8 km) walking distance of its geographic center. How many uses should be counted when attempting Smart Location & Linkage (SLL) prerequisite?
The intent of Neighborhood Pattern and Design Credit. Community Outreach and Involvement is to
A projectsite Includes 3.500 ft. (1.067 m) of streets, excluding driveways and utility vaults. How many street trees must be planted to meet the minimum requirements or Neighborhood Pattern and Design Credit. Tree-Lined and Shaded Streetscapes. Option 1: Tree-Lined Blocks?