Question # 1

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

Question # 2

Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?

A.

Sustainable Sites Credit, Site Management

B.

Materials and Resources Credit, Purchasing - Lamps

C.

Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management

D.

Indoor Environmental Quality Credit, Indoor Air Quality Management Program

Question # 3

How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water

Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?

A.

Six months

B.

12 months

C.

18 months

D.

This type of fixture should not be metered

Question # 4

For Energy and Atmosphere Credit, Advanced Energy Metering, which individual end uses are required to be metered?

A.

Those that represent at least 10% of the total annual consumption of the building minus plug load use

B.

Those that represent at least 15% of the total annual consumption of the building minus plug load use

C.

Those that represent at least 20% of the total annual consumption of the building minus plug load use

D.

Those that represent at least 25% of the total annual consumption of the building minus plug load use

Question # 5

When calculating Water Efficiency Credit, Outdoor Water Use Reduction, the irrigation of athletic fields

A.

must be included in the calculations

B.

must be excluded from the calculations

C.

may be included in or excluded from the calculations

D.

may be calculated using a standard 20% reduction from baseline

Question # 6

Which refrigerant was phased out due to the Montreal Protocol?

A.

CFC-11

B.

HCFC-22

C.

HFC-134a

D.

HCFC-123

Question # 7

An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects. What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and

Renovation Policy?

A.

Requirements around the selection of low-emitting materials for renovation projects

B.

Requirements for contractors to safeguard air quality during renovation

C.

Requirements for the salvage and reuse of furniture within the building

D.

Requirements for contractors to perform construction activity pollution prevention

Question # 8

What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

10% of the vacant space

B.

10% of the gross floor area

C.

10% of the project site area

D.

10% of the regularly occupied area

Question # 9

Which of the following environmental concerns is exacerbated by impervious surfaces?

A.

Increase in light pollution

B.

Indoor Environmental Quality decreases

C.

Retention pond diminishment

D.

Contaminated runoff harming aquatic life

Question # 10

A LEED AP Operations and Maintenance project is at the end of the second month of the performance period when the team notices that the water meter readings for one of the two submeters is not being recorded. What advice should the LEED AP give the project team in order to comply with Water Efficiency Credit, Water Metering?

A.

Submit a Project CIR

B.

Use the incomplete data as is

C.

Remove the missing meter data from the credit upload

D.

Extend the performance period to gain the full three months of weekly water meter readings