Weekend Special Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

Page: 1 / 13
Total 129 questions
Exam Code: LEED-Green-Associate                Update: Jul 19, 2026
Exam Name: LEED Green Associate GAFRE Exam (LEED GA)

USGBC LEED Green Associate GAFRE Exam (LEED GA) LEED-Green-Associate Exam Dumps: Updated Questions & Answers (July 2026)

Question # 1

The general contractor for a project located in a dense urban area attempts to gain a credit in Materials and Resources. Which of the following is considered a local material?

A.

Quarry tile that is extracted 370 mi (595 km) away and manufactured in a city 1.600 mi (2 575 km) away

B.

Stone that is harvested and processed 80 mi (128.7 km) from the project site and purchased 75 mi. (121 km) away

C.

Vinyl flooring manufactured 500 mi (805 km) away but is sold at a warehouse 2 mi (3.2 km) from the project site

D.

Bamboo flooring that is harvested 2.350 mi. (3 782 km) away and manufactured 200 mi. (322 km) away from the project site

Question # 2

Which of the following is a type of quality transit in LEED?

A.

Taxi

B.

Bicycle

C.

Motorcycle

D.

Single passenger car

Question # 3

When redesigning wall assemblies to meet energy code requirements while improving noise control, which strategy effectively supports both objectives?

A.

Installing single-glazed windows

B.

Using staggered studs

C.

Utilizing insulation with a high U-value

D.

Removing insulation from wall cavities

Question # 4

What is the maximum number of occupiable stories for a project to be considered LEED Building Design and Construction Homes and Multifamily Low-rise?

A.

Two

B.

Three

C.

Four

D.

Five

Question # 5

Which permanently installed building products are addressed in the Materials and Resources Credit category calculation?

A.

Framing

B.

Elevators

C.

Process equipment

D.

Formwork for concrete

Question # 6

In an effort to preserve the aquatic habitat and natural stream morphology of a fresh-water stream located downstream of a project boundary, one should consider which of the following strategies?

A.

Minimize pervious surfaces, enhance native vegetation and capture and reuse rainwater

B.

Minimize impervious surfaces, enhance native vegetation and capture and reuse rainwater

C.

Minimize pervious surfaces, implement low-impact development strategies and mimic natural systems

D.

Minimize impervious surfaces, implement high-impact development strategies and mimic natural systems

Question # 7

Which of the following facilitates the recharging of aquifers?

A.

Asphalt road

B.

Pervious paving

C.

Impervious paving

D.

Concrete parking lot

Question # 8

An integrative process involves stakeholders identifying overlapping relationships, services and redundancies among systems. What does this result in?

A.

Reduced performance and reduced costs

B.

Increased performance and reduced costs

C.

Reduced performance and increased costs

D.

Increased performance and increased costs

Question # 9

An architect found a source for reclaimed wood doors from a recently demolished building 600 mi. (966 km) away from the project site. Towards which of the following sustainable criteria can the doors be used?

A.

Certified Wood

B.

Materials Reuse

C.

Recycled Content

D.

Local Materials

Question # 10

Which of the following should a project team focus on to ensure an efficient water design that protects community water resources while maintaining high-quality landscapes?

A.

Implementing rainwater harvesting systems

B.

Installing traditional irrigation systems

C.

Using high-flow irrigation systems

D.

Expanding turfgrass areas that require frequent watering

Page: 1 / 13
Total 129 questions

Most Popular Certification Exams

Payment

       

Contact us

Site Secure

mcafee secure

TESTED 19 Jul 2026