Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dcdisc65

Page: 1 / 6
Total 60 questions
Exam Code: CTFL_Syll_4.0                Update: Oct 15, 2025
Exam Name: ISTQB Certified Tester Foundation Level (CTFL) v4.0

iSQI ISTQB Certified Tester Foundation Level (CTFL) v4.0 CTFL_Syll_4.0 Exam Dumps: Updated Questions & Answers (October 2025)

Question # 1

The tests at the bottom layer of the test pyramid:

A.

run faster than the tests at the top layer of the pyramid

B.

cover larger pieces of functionalities than the tests at the top layer of the pyramid

C.

are defined as 'Ul Tests' or 'End-To-End tests' in the different models of the pyramid

D.

are unscripted tests produced by experience-based test techniques

Question # 2

Which ONE of the following elements is TYPICALLY part of atest plan?

A.

The budget and schedule for the test project.

B.

A detailed analysis of the defects found and their causes.

C.

A detailed report on the test results after the test project is completed.

D.

A list of test logs from the test execution.

Question # 3

Which ONE of the following elements is TYPICALLYNOTpart of atest progress report?

A.

Obstacles and their workarounds

B.

A detailed assessment of product quality

C.

Test metrics to show the current status of the test process

D.

New or changed risks

Question # 4

Which of the following statements about the shift-left approach is true?

A.

Shift-left in testing can be implemented only in Agile/DevOps frameworks, as it relies completely on automated testing activities performed within a continuous integration process

B.

Performance testing performed during component testing, is a form of shift-left in testing that avoids planning and executing costly end-to-end testing at the system test level in a production-like environment

C.

Shift-left in testing can be implemented in several ways to find functional defects early in the lifecycle, but it cannot be relied upon to find defects associated with non-functional characteristics

D.

Continuous integration supports shift-left in testing as it can reduce the time between the introduction of a defect and its detection, thereby reducing the cost to fix it

Question # 5

Which ONE of the following activities TYPICALLY belongs to the planning phase of the review process?

A.

A separate defect report is created for each identified defect so that corrective actions can be tracked.

B.

Each reviewer conducts an individual review to identify anomalies, recommendations, and questions.

C.

The purpose and scope of the review are defined, as well as the work product to be reviewed and the exit criteria.

D.

The reviewers analyze and discuss the anomalies found during the review in a joint meeting.

Question # 6

A company runs a pilot project for evaluation of a test automation tool. Which of the following is NOT a valid object of this pilot project?

A.

Get familiar with the functionality and options of the tool

B.

Check haw the tool fits to the existing test processes

C.

Train all testers on using the tool

D.

Decide upon standards for tool implementation

Question # 7

Which ONE of the following statements BEST applies tochecklist-based testing?

A.

Checklists should contain general guidelines to ensure that all aspects of the software are covered.

B.

Checklists should contain specific test conditions that can be individually and directly checked.

C.

Checklists should primarily consist of automated test cases to maximize efficiency.

D.

Checklists should be used exclusively for functional testing, as they are unsuitable for non-functional testing.

Question # 8

Which of the following statements about impact of DevOps on testing is CORRECT?

A.

DevOps helps bring focus on testing of non-functional characteristics

B.

DevOps helps shift focus of testing people to perform operations testing

C.

DevOps helps shift focus of operations people to functional testing

D.

DevOps helps eliminate manual testing by having focus on continuous automated testing

Question # 9

A typical test objective is to:

A.

determine the most appropriate level of detail with which to design test cases

B.

verify the compliance of the test object with regulatory requirements

C.

plan test activities in accordance with the existing test policy and test strategy verify the correct creation and configuration of the test environment

Question # 10

Consider the followingiteration planning taskswhere a tester can provide value:

    Break down user stories into tasks (particularly testing tasks)

    Estimate test effort for all testing tasks

    Identify and refine functional and non-functional aspects of the test object

Which ONE of the following tasks should be ADDED to the above list?

A.

Determining the test strategy

B.

Participating in the detailed risk analysis of user stories and determining their testability

C.

Planning the testing for the release

D.

Writing testable user stories and acceptance criteria

Page: 1 / 6
Total 60 questions

Most Popular Certification Exams

Payment

       

Contact us

dumpscollection live chat

Site Secure

mcafee secure

TESTED 16 Oct 2025