Pre-Winter Special Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: best70

Page: 1 / 2
Total 15 questions
Exam Code: HPE7-V01                Update: Sep 17, 2026
Exam Name: Advanced HPE Edge-to-Cloud Solutions

HP Advanced HPE Edge-to-Cloud Solutions HPE7-V01 Exam Dumps: Updated Questions & Answers (September 2026)

Question # 1

You are designing a solution for a customer that will support a virtualization workload based on HPE Synergy. Your customer has the following requirements:

    Dual-socket HPE Synergy compute nodes running ESXi 8.x with maximum memory supported

    Each node should have access to shared storage from HPE Alletra Storage MP B10000

    All virtual machines should be protected against host failure

    All virtual machines with vGPU must be protected with Fault Tolerance

    All compute nodes should boot from disks located in the D3940 Storage Modules protected with RAID 1

    All frames should be managed as one logical enclosure to simplify management

    All compute nodes should support two network ports with the maximum Ethernet connectivity speed

You are reviewing a proposal that you must verify. The proposal consists of:

    3 x HPE Synergy 12000 frames

    2 x HPE Synergy Composer2 modules

    4 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 x HPE Synergy 50Gb Interconnect Link Modules

    3 x HPE Synergy D3940 Storage Modules, each with 20 SSD drives

    1152 core VMware vSphere Enterprise Plus subscriptions

    36 x HPE Synergy 480 Gen11 compute nodes

Each SY480 Gen11 is configured with:

    A single Platinum CPU with 32 cores

    HPE Synergy 6820C 25/50Gb Converged Network Adapter

    HPE Synergy 5830C 32Gb Fibre Channel Host Bus Adapter

    HPE MR416i-o Gen11 12G SAS Mezzanine Controller

Which two statements are true regarding the proposal? (Select two.)

A.

2 HPE Synergy 50Gb Interconnect Link Modules should be removed from the proposal, as the total number of interconnects required is six.

B.

HPE MR416i-o Smart RAID controller can be removed because there are no external SAS disk enclosures included in the proposal.

C.

Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy can be removed from the proposal because all requirements are met without them.

D.

To access HPE Alletra MP B10000 arrays, FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Modules for Synergy must be purchased.

E.

vSphere Enterprise Plus subscriptions can be replaced with vSphere Standard subscriptions.

Question # 2

Which statement about designing HPE SimpliVity solutions for high availability is true?

A.

If a stretched cluster is configured, an arbiter should be deployed in both sites.

B.

Standard HA clusters require a vSphere Foundation subscription at minimum.

C.

At least four availability zones should be configured between sites.

D.

If a stretched cluster is configured, an arbiter should be deployed at a third site.

Question # 3

Your customer has HPE Superdome Flex running VMware ESXi 8.x. Current setup consists of:

    One Rack Management Controller

    One HPE Superdome Flex Base chassis

    One HPE Superdome Flex Expansion chassis

The existing complex has a single nPartition. The customer plans to expand the existing nPartition with two additional expansion chassis.

Which statement about the planned expansion is true?

A.

If the existing nPartition is managed using HPE OneView, it must be removed before an expansion.

B.

Customer has to replace one of the expansion chassis with base chassis, to provide I/O redundancy.

C.

In order to add two additional chassis, customer has to power off the existing nPartition.

D.

Existing nPartition must be placed in the maintenance mode using Rack Management Controller CLI.

Question # 4

Your customer requires a data protection solution that will support their workloads running on an HPE Alletra MP B10000 storage array.

Your customer requirements include:

    Protecting VMware vSphere workloads

    Covering different hypervisors

    Pay-per-use model

    Near synchronous and block-level replication

Select the most appropriate solution.

A.

HPE Zerto

B.

HPE Data Ops Manager

C.

HPE Alletra Storage Server 4120

D.

HPE StoreOnce 3660

Question # 5

Your customer is requesting an update to their data protection plan, to include a copy of several volumes to two different locations. The current environment is utilizing HPE Alletra Storage MP B10000 systems.

What is true about this solution?

A.

Synchronous replication can be used to define two destination targets, when appropriate license is installed.

B.

Synchronous replication can be configured between three arrays.

C.

Asynchronous replication can be configured between three arrays.

D.

A synchronous long-distance periodic copy configuration can be used to define two destination targets.

Question # 6

Your customer plans to replace a legacy HPE BladeSystem solution with the HPE Synergy platform.

The customer requirements include:

    30 compute nodes to support their virtualization workloads

    Redundancy within the management subsystem

    An in-frame storage solution to support vSAN

    A redundant networking subsystem with the ability to virtualize WWNs

    Simplified management with a single logical enclosure

You are reviewing the following proposal:

    3 x HPE Synergy 12000 frames

    2 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 x HPE Synergy 50Gb Interconnect Link Modules

    3 x HPE D3940 Storage Modules with maximum number of drives

    6 x HPE Composer2 + 30 x HPE OneView Advanced licenses

    30 x SY 480 Gen11 compute modules, each with 2 CPUs and appropriate mezzanine cards

Which statement about this proposal is true to help meet the customer requirements?

A.

Additional HPE OneView Advanced licenses should be added for the HPE Virtual Connect modules and HPE D3940 Storage Modules.

B.

30 x HPE OneView Advanced licenses should be removed from the proposal.

C.

HPE 32Gb switches should be added to the proposal to enable WWNs virtualization and profile mobility.

D.

3 x HPE Composer2 modules can be removed from the proposal, as you need one HPE Composer2 module per HPE Synergy frame for enhanced availability.

Question # 7

Your customer is expecting to see an increase in the amount of data stored on their HPE Alletra Storage MP B10000.

They are asking to create a plan to support a raw capacity of 450 TB all flash.

Refer to exhibit

What change would you recommend to the configuration to achieve this?

A.

Add 100Gb HBAs to B10120 nodes and additional drive shelf.

B.

Replace the QLC drives with higher capacity TLC drives.

C.

Add more QLC drives to the system and change the sparing to minimal.

D.

Replace the nodes with B10120 model and add additional drive shelf.

Question # 8

Your customer is planning to deploy several HPE ProLiant DL360 Gen11 servers with Windows Server 2025, for a bare-metal use case with no hypervisors.

The customer is concerned about the time it takes to scan and deploy the servers for new firmware and driver updates.

What HPE management tool can be used in this scenario to apply firmware updates to servers, with direct integration to HPE repositories?

A.

HPE OneView

B.

HPE Compute Ops Management

C.

HPE iLO Amplifier

D.

Microsoft Endpoint Configuration Manager

Question # 9

You are validating the hardware architecture for an AI solution.

Your customer has requested that you focus on possible upgrades for their HPE ProLiant Compute DL384 Gen12 server.

Which of the following statements is correct?

A.

The GPU performance can be increased by adding more Nvidia GB200 accelerators.

B.

The Superchips on the server include a fixed amount for the memory configuration.

C.

The amount of supported EDSFF drives depends on the selected RAID controller.

D.

The 400Gb NICs can be added if liquid cooling is used with the chassis.

Question # 10

Your customer is currently using an HPE SimpliVity 380 Gen10 solution and is planning for a generation refresh to an HPE SimpliVity 380 Gen11.

The existing cluster is planned to be maintained as a test and dev platform for another 24–36 months while production workloads are moved to the new environment.

The new solution will be purchased as HPE GreenLake for Private Cloud Business Edition, and the customer would like to include the existing Gen10 cluster within the same management platform.

Which statement is true about combining the management of both the old and new generations?

A.

The new PCBE platform can be downgraded for on-prem management for interoperability with the Gen10.

B.

The existing SimpliVity environment needs to be redeployed as PCBE to co-exist with the new solution.

C.

The new PCBE platform can manage the old platform by utilizing the Data Services Connector OVA.

D.

The existing SimpliVity environment can be imported into the HPE GreenLake platform using Data Services Connector.

Page: 1 / 2
Total 15 questions

Most Popular Certification Exams

Payment

       

Contact us

Site Secure

mcafee secure

TESTED 18 Sep 2026