Exam Code: H19-132_V1.0                Update: Nov 19, 2026
Exam Name: HCSA-Presales-Data Center Facility (Modular DC) V1.0

Huawei HCSA-Presales-Data Center Facility (Modular DC) V1.0 H19-132_V1.0 Exam Dumps: Updated Questions & Answers (November 2026)

Question # 1

Which of the following statements are incorrect about the “capability of safety and quality planning” among the “four capabilities” of SQA professional skills?

Select All that Apply.

A.

Quality planning is the process of identifying and developing quality objectives for projects and products, as well as the techniques, processes, tools, key measures, etc., required to achieve these objectives and to ensure that the end result meets customer requirements.

B.

SQA is the primary owner for project quality planning.

C.

Quality planning is independently completed by the SQA.

D.

With delivery as the ultimate goal, make the requirements clear to the team in advance by planning activities. Preparedness ensures success, while unpreparedness spells failure.

Question # 2

Which components are included as standard in the FusionModule800 BC5L configuration?

Select All that Apply.

A.

Temperature sensor

B.

PAD

C.

Smoke sensor

D.

Smart Door Lock

Question # 3

Which functions can the local smart screen of the micro-module provide?

Select All that Apply.

A.

Facial recognition login for the surveillance system

B.

Core subsystem information display

C.

PUE demonstration

D.

Facial recognition access control

Question # 4

For how long can the FusionDC1000A prefabricated integrated data center endure the C4 corrosion-resistance durability test?

A.

720

B.

1440

C.

480

D.

1660

Question # 5

Which two FusionModule800 configurations support optional continuous cooling?

Select All that Apply.

A.

BC4L

B.

BC1L

C.

BC3L

D.

BC2L

Question # 6

What is the height of the 30kVA power module in the integrated Modular UPS of FusionDC1000A-40ftIT?

A.

1U

B.

2U

C.

3U

D.

4U

Question # 7

According to the training materials, construction-site safety management can be classified into __________.

Select All that Apply.

A.

Safety technology management

B.

Site and facility management

C.

Safety organization management

D.

Behavior control

Question # 8

Which of the following statements regarding FusionModule800 is incorrect?

A.

FusionModule800 is suitable for small-scale data center scenarios. It only supports N+l power distribution and does not support 2N power distribution architecture.

B.

The FusionModule800 supports optional built-in fire suppression modules, eliminating the need for fire protection system reconstruction.

C.

FusionModule800 supports IT loads ≤ 40 kW.

Question # 9

Huawei FusionDC1000 Prefabricated Modular Data Center Solution includes _____.

Select All that Apply.

A.

FusionDC1000B

B.

FusionDC1000A

C.

FusionDC1000C

Question # 10

Which of the following statements are correct about “Raise a sense of responsibility” in Huawei Digital Power’s quality guideline?

Select All that Apply.

A.

We encourage mutual supervision and weakness identification in neighboring domains, and proactively promote business improvement in neighboring domains.

B.

Only when everyone in our organization shoulders their own responsibilities can we ensure a sound operation during every end-to-end phase, and the high quality of products and services.

C.

When problems arise, we encourage everyone to first reflect on their unsatisfactory attitudes and behaviors. We oppose the behavior to blame others for their attitudes and behaviors while one fails to fulfill one's own duties.

D.

We encourage the exposure of problems and the positive attitude upon a newly found problem.